Akosombo Restoration on Course: Chief Executive Inspects Interim Control Room
It has been ten (10) weeks since the 23rd April 2026 fire incident ravaged the GRIDCo Akosombo Control Room, reducing its 161kV Switchyard to ashes. Since then, significant efforts through the Akosombo Power Restoration Works have been ongoing. A temporary transmission connection was established within a week to reconnect the Akosombo Generating Station and sustain









