Ghana–Burkina Technical Sub-Committee Meeting Held
The first 2025 bi-annual Technical Sub-committee (TSC) meeting has been held. The meeting took place in Tema from the 9th to the
Ag. Chief Executive, Ing. Mark Awuah Baah Speaks at the 2025 Africa Energy Technology Conference
The Acting Chief Executive of GRIDCo, Ing. Mark Awuah Baah, featured as a panellist at the 2025 Africa Energy Technology Conference (AETC), held
Regional Maritime University (RMU) Students Tour Kasoa and Pokuase BSPs
Electrical Engineering students from Regional Maritime University (RMU) recently visited GRIDCo’s Kasoa and Pokuase Substations; critical assets in Ghana’s Power Transmission Network. The
Advanced SVC Equipment at Kasoa Substation Restored to Service
A collaboration between the Tamale Operational Area, (NND), and the Accra Operational Area, (SND), has revived and energised the 50MVAR STATCOM, (Advanced SVC),
NIB MD Visits GRIDCo
A delegation from the National Investment Bank, (NIB), led by Dr. Doli-Wura Zakaria, the Managing Director (MD) paid a courtesy call on
Safety Coordinators Hold First 2025 Bi-Annual Meeting
Safety Coordinators recently met to deliberate on ways to improve the safety culture in the Company. The meeting, held in Kumasi, saw a